UZWOOLENTEX, Uzbekistan: a whole finishing floor, planned by us

A worsted mill in the Fergana Valley. We drew the process route and the floor plan for its wet and dry finishing, and built most of the machines on it.

The brief

UZWOOLENTEX weaves worsted and wool-blend cloth in Margilan, in Uzbekistan’s Fergana Valley: suiting, women’s wear and uniform fabric. The finishing area, where the cloth gets its handle, its stability and its lustre, was left to us.

We worked out the process route for their fabrics, drew the floor plan for the whole wet and dry finishing area, and supplied most of the machines on it. Our engineers installed them on site.

In 2019, O’zbekiston 24, Uzbekistan’s state television channel, filmed at the mill while that work was under way. The finishing machines in the report are ours.

On national television

O’zbekiston 24, Uzbekistan’s state television channel, 2019. In Uzbek; English subtitles by QL. The finishing machines in the footage are ours.
Read the transcript
  1. 0:00…have begun putting the President’s initiative into practice.
  2. 0:03This building was handed to us at zero value,
  3. 0:07on condition that we invest 10 million US dollars.
  4. 0:13We have now completed the first stage of the project.
  5. 0:17We have brought in equipment to make 2 million metres of semi-wool fabric a year.
  6. 0:25Under the new project, looms for wool-blend fabrics,
  7. 0:28needed not only for women’s clothing but also for special uniforms,
  8. 0:34are being installed in the new production halls.
  9. 0:37The weaving technology comes from European companies.
  10. 0:41The President’s visit to the plant last year inspired all of us.
  11. 0:45Our new enterprise is itself an example of cooperation between Uzbekistan and China,
  12. 0:51says the Chinese investor.
  13. 0:53The new mill will start production in the second half of this year.
  14. 0:59In the following stages, a wool-blend yarn section
  15. 1:03and the fabric dyeing and finishing sections will start operating.

What stands on the floor

We planned this finishing floor end to end, wet and dry: the process route for their fabrics first, then the machine at each station and where it stands. Every station on it is one we can build and deliver. Machine by machine, in the order the cloth travels:

Wet finishing

  1. Two QL rope scouring machines side by side in the new finishing hall at UZWOOLENTEX
    Two technicians loading the first white cloth into a QL rope scouring machine

    01Rope scouring

    Rope scouring machines

    Wash the cloth in rope form, taking out the oil and dirt it picks up in spinning and weaving.

  2. CIMI Flexifola 4C scouring and milling machine installed in the UZWOOLENTEX finishing hall

    02Scouring and milling

    CIMI Flexifola 4C

    A CIMI scouring and milling machine from Italy, placed in the line to our layout. For this station we now build our own four-channel machine, WPF-4XS.

  3. Rope opening machine with a tall orange untwisting tower, cloth rising through it

    03Untwisting and opening

    Rope opening machine

    Takes the cloth out of rope form and opens it to full width for the stations that follow.

  4. Crabbing section of the UZWOOLENTEX finishing hall, a row of QL crabbing machines under overhead cloth frames
    Earlier-generation QL crabbing machine with its control cabinet, the rope opener tower behind
    Two earlier-generation QL crabbing machines in line, stainless troughs and cloth rollers

    04Crabbing

    Crabbing machines, earlier generation

    Set the cloth in hot water under tension, so it holds its shape through everything that follows. These are our earlier generation. The current WPF-ZN goes further:

    • Single-bath reciprocation: the cloth travels back and forth between two cylinders in one liquor, so the whole piece gets one heat history, end to end and inside to outside
    • The wrapper carries the tension, not the fabric: zero elongation, so knitted wool can be crabbed as readily as woven
    • Entry scutching and centring: the cloth winds flat, with no white selvedge marks
    • A cooling trough at delivery fixes the set, and plaited stacks stay free of crease marks
  5. QL continuous crabbing and drying line at UZWOOLENTEX, full length from the entry end
    Side view of the QL continuous crabbing and drying line, crabbing units and drive motors
    Cloth entry of the QL continuous crabbing and drying line, technicians at the feed

    05Continuous crabbing and drying

    Continuous Crabbing and Drying Line

    Crabs the cloth continuously, then dries it on cylinders in the same line.

Dry finishing

  1. QL moistening machine in orange and grey at UZWOOLENTEX

    06Moistening

    Moistening machine

    Gives the dry cloth an even, fine moisture before pressing and steaming, so it responds evenly across the width.

  2. QL brushing machine with orange frame and dust extraction duct at UZWOOLENTEX

    07Brushing

    Brushing machine

    Lays the surface fibres in one direction and clears loose fibre and dust. For this station we now build WPF-SM, a vertical brushing machine, with a steam box as an option.

  3. Green QL weft straightener feeding the orange silicone-belt calender

    08Weft straightening

    Weft straightener

    Squares up bowed or skewed weft before the cloth is pressed, so stripes and checks run true.

  4. Silicone-belt calender in orange and grey, white cloth running over the top frame

    09Calendering

    Silicone-belt calender

    Presses the cloth flat and smooth under a silicone belt.

The nameplates read SIMACHINE: in 2019 we traded as Wuxi Xingweixing Machinery. We have been Wuxi Qianli Machinery since 2020.

Planning a finishing floor?

We start from the process route for your fabrics, then the machines, then where each one stands.

Talk to us directly

Andy Wei · Project Director

Wuxi local time — (UTC+8)